enviromarbl.blogg.se

Trimble Coordinate System Manager Is Not Properly U Q1consultants


Trimble Coordinate System Manager Is Not Properly U Q1consultants

• • • • • • • • • • You are here: • • • Recordings and Written Materials Working with the State Plane Coordinate System and Conducting Control Surveys Presenter: Alan R. Dragoo Recording Date: March 29, 2017 Recording Location: Fairfax, VA Type: CD/Manual Package Product Code: 14483 Product Number: 17 VAWWSPCS 3 29 CDMN TC State-Specific Continuing Education Info: • • • • • • Description: This audio recording is approximately 7 hours in length and is available for $279 (including shipping). Please refer to specific state licensing rules or certification requirements to determine if this learning method is eligible for continuing education credit. How to Use HalfMoon will mail you these materials via USPS. Please allow 5 weeks from the date of purchase to receive your product. If the live seminar is in the future, please allow 5 weeks from the date of the live seminar.

Should I remove Trimble Coordinate System Manager (64-bit) by Trimble Navigation Limited? Learn how to remove Trimble Coordinate System Manager (64. Coordinate Systems and Datum Transformations. Datum Transformations with Trimble Positions. The coordinate system of the project.

The CD/Manual package includes an audio recording of a live seminar on CDs, along with a bound copy of the manual that was distributed at the seminar. The manual contains written materials prepared by the seminar speaker(s). The CDs contain embedded number codes, which you are required to document and return to HalfMoon if you wish to obtain a certificate of completion for the program. The acceptance of self-administered continuing education activities vary widely between states and professions.

Before undertaking any self-study effort, you should review the rules of your licensing/certifying entity. HalfMoon Education guarantees its products. The self-study products are recorded from a live seminar and there are circumstances where an audio recording is not available. HalfMoon will contact you and issue a full refund if the product you ordered is not available. If you are not happy with a product you receive, you can return the product for a full refund. However, refunds will not be issued if completion certificates are requested. Agenda: Registration: 8:00 - 8:30 am Morning Session: 8:30 am - 12:00 pm Lunch (On your own): 12:00 - 1:00 pm Afternoon Session: 1:00 - 5:00 pm Development of State Plane Coordinate System Who developed the state plane coordinate system?

Q1consultants

Why was the state plane coordinate system developed? How were the state plane coordinate systems for the states designed? Development of Individual State Systems Background for understanding projections Understanding the Lambert Conformal Projection Understanding the Transverse Mercator Projection Analysis of state plane coordinate system distortions for various states Use of Projections in State Systems Using the Lambert Conformal Projection • Maryland and Washington D.C. Add To Cart Due to the size of the Audio file, the download time may vary due to your internet connection speed. The average download time is about 10-15 minutes.

If you have slow internet and would prefer to purchase the CD/Manual Package through the mail instead, click the button on the left. If you want to continue to purchase the downloadable MP3/PDF, click the button on the right.

• • • • • • • • • • • • 754 Bartlett Ave Altoona, WI 54720 P: F: Connect With Us • • • Copyright © 2018 HalfMoon Education, Inc. All Rights Reserved. HalfMoon Education Inc. Is a nonprofit continuing education corporation. Custom Website Design and Hosting.

Coordinate Systems and Datum Transformations from Trimble’s Positions Blog Post As this user community knows, collecting high accuracy data requires a working knowledge of coordinate systems, or spatial references, and datum transformations. The intent of this (long overdue) post is not to deep dive into these topics but rather to summarize how and where datum transformations are used in Trimble Positions. Let’s look at the two basic workflows. [Disclaimer: The reader is assumed to have pre-existing knowledge of coordinate systems, datums, datum transformations, and which of each applies to their data.] ArcPad Workflow In an ArcPad workflow, coordinate systems come into play in 3 places: at the geodatabase feature class level where the data is stored, at the ArcMap map document (data frame) level where the data is symbolized and “presented”, and in ArcPad where data is collected. Esri provides form controls for selecting the coordinate system (geographic or projected) for a feature class and also for the data frame of a map document in ArcMap and ArcCatalog. When the datums differ, you are prompted for a datum transformation in ArcMap.